JJC Hire Ltd. Biomass Boiler

Sandscale Park, Park Road, Barrow-in-Furness, Cumbria LA14 4QT

LA-PPC Waste Wood Burning Boiler of >50kg/h but less than 1MW thermal capacity

(Process Guidance Note 1/12 (13))

Permit Reference PPC/B/35
Regulation Type B
Description

The boiler is a Heizomat RHK-AK 1000 boiler fueled by 'Grade A' waste wood in addition to virgin wood/biomass. No Grades B, C and D waste wood will be used. The boiler has an operational capacity of up to approximately 285kg.hour-1 generating up to 900KWh of renewable heat for use on the adjacent site. The boiler will be operated on a continuous basis, 24 hours per day, 7 days per week, except during periods of maintenance. Wood is fed continuously to the boiler from the biomass fuel storage area via a walking floor loading system.

Applications

(inc. permits, variations, transfers, surrender)

Permit

PPC/B/35 Permit

Inspections

First Check Inspection Pending

Monitoring Information
Risk Assessment


Risk Assessment Score
Notices


Convictions/Cautions None

Additional Information

(e.g. supplied by the operator in compliance with a condition)



LA Number 24213
Officer Geoff Dowker